Phase I, II Environmental Investigation/Facility Closure and Site Demolition and Decontamination, Battery X-Change, Portland, Oregon (2006-2007)
Conducted comprehensive Phase I and II ESAs to establish the lateral and vertical extent of lead contamination at the subject site. Work involved researching historical operating and land use information for the site; preparing a sampling and analysis plan; collecting several dozen wipe samples, shallow soil samples, and water samples; evaluating laboratory data; and preparing Phase I and II reports using standard ASTM protocols. Work also involved selecting a General Demolition Contractor, providing oversight during abatement of asbestos, PCBs, lead-contaminated soils, and building demolition; waste characterization; conducting Phase III confirmation soil sampling and testing after cleanup; and preparing a facility closure report. DEQ issued a No Further Action for this site in March 2007.
Our Major Areas of Expertise:
Brownfield Cleanup & Remediation
Creekside has obtained over 40 "No Further Action" (NFA) Determinations for our clients in the last 20 years on properties that required environmental assessment and "clean closure."
Meet Our Team
Click to learn more about our team of Portland, Oregon environmental contractors, which includes a Certified Hazardous Materials Manager, hydrogeologists, environmental engineers, and environmental scientists.