Portland Harbor Source Control Evaluation – Peninsula Iron Works, Portland, Oregon (July 2012 – Present)
Based on City of Portland’s recently completed industrial source control study, Peninsula Iron Works was identified as a potential source of contamination to the Portland Harbor at Basin 52 near Cathedral Park on the east side of the Willamette River. A Strategy Recommendation was completed & DEQ determined a Preliminary Assessment (PA) on the subject property should be conducted. Creekside completed the PA in July 2005, and prepared a work plan for DEQ which involved hot spot removal of PCB-impacted soils. Creekside provided construction oversight during remediation, collected confirmatory samples, prepared an ecological risk assessment, and successfully obtained an NFA from DEQ in May 2006.